Dallas Bathroom Remodeling

Walk-in showers, garden tub conversions, and master bath upgrades for Dallas homes. Premium waterproofing and a 2-year warranty.

Bathrooms Built for How Dallas Homes Are Lived In

Dallas master baths from the 1970s–2000s often still have garden tubs, dated tile, and layouts that do not match daily use. Guest baths may lag even further. We remodel full bathrooms — not the cheapest powder-room-only flips.

Walk-in showers, double vanities, proper waterproofing, and durable tile are core to our work. We plan moisture management carefully for North Texas humidity and hard water.

How a Local Project Works

  • Free in-home consultation — we visit your home and give honest advice on scope, timeline, and budget.
  • 3D design renderings from our in-house designer, before we touch a wall.
  • Itemized pricing with no surprise line items.
  • 2-year workmanship warranty on every project.
Free in-home consultationCustom 3D design renderings2-year workmanship warrantyTransparent, itemized pricing

What Dallas Bathroom Remodels Typically Cost

Full bathroom remodels commonly run $20,000–$40,000. Higher-end master baths with large showers, premium tile, and double vanities can reach up to about $75,000 depending on scope.

Bathroom

Master bath: garden tub to walk-in shower

$35,000–$65,000

Timeline: 5–8 weeks

A frequent Dallas master-bath request: remove a seldom-used garden tub, build a walk-in shower, update the vanity, and retile wet areas with proper waterproofing.

Looking for kitchen pricing too? See our full kitchen & bathroom cost guide or our Dallas kitchen remodeling page.

What's Included in Your Estimate — and What's Not

Every quote is itemized line by line, so you always know exactly what your budget covers before we start.

Included in every project

  • Free in-home consultation and a detailed, itemized estimate
  • In-house 3D design renderings and material selection
  • Demolition and site protection
  • Materials and labor for the full agreed scope
  • All city permits and inspections
  • Plumbing and electrical rough-in and finishing
  • Project management and daily job-site oversight
  • Final cleanup and a post-project walkthrough
  • 2-year workmanship warranty

Not included unless specified

  • Additions or new square footage
  • Foundation or major structural work
  • Appliances — unless included in your agreed scope
  • Window or door replacement, unless specified
  • Temporary housing or off-site storage during the build
  • Utilities re-routed by the city or utility providers
  • Any item outside the agreed scope discovered during demolition — we flag it immediately and price it transparently before proceeding

Dallas Bathroom Patterns We See Often

Common starting points in consultations — not guarantees for every house:

Garden tub conversions

Removing an unused soaking tub for a larger walk-in shower is one of the most requested master-bath changes in Dallas-area plans.

Original mid-century and 1980s–90s baths

Tub-shower combos and dated tile are frequent candidates for a full wet-area rebuild.

Guest and hall baths

When part of a larger remodel, secondary baths get vanity, tile, and fixture upgrades that match the new standard.

Waterproofing first

Correct membranes, slope, and ventilation matter as much as tile choice for long-term performance.

The Dallas Bathroom Remodeling Process

A proven design-build process, from first call to final walkthrough. See the full detail on our our process page.

01

Free Consultation

We visit your bathroom, assess the space, and give honest advice on scope and budget.

02

Design & Selections

Tile, fixtures, glass, and vanity selections with 3D guidance where helpful.

03

Permits & Prep

We handle City of Dallas permitting and protect the rest of your home before demo.

04

Construction

Waterproofing, tile, plumbing, and finishes — managed to a clear schedule.

05

Walkthrough & Warranty

Final walkthrough and our 2-year workmanship warranty.

Dallas Bathroom Remodel FAQs

Common questions about bathroom remodeling in Dallas.

How long does a master bath remodel take in Dallas?

Many master baths complete in roughly 5–8 weeks of construction after design and material lead times. Large tile packages and custom glass can extend the schedule.

Can you convert a garden tub to a walk-in shower?

Yes — that is a common Dallas request. Cost depends on plumbing location, shower size, bench and niche details, and glass selection.

What is not a fit for your team?

We focus on full bathroom and kitchen remodels. Ultra-low-budget powder-room-only jobs are outside our model so we can protect quality and schedule for complete projects.

Do you handle permits?

We prepare and coordinate permits required by the City of Dallas for the agreed scope and support inspections during construction.

Ready to Start Your Project?

Call us directly or schedule a free in-home consultation. We'll walk your home, listen to your goals, and give you an honest, itemized estimate.

(214) 449-5922
Schedule Free Consultation